Progress on the new truss! As much work as we're likely to finish this year, anyhow. First step is to put the old truss back in exactly where it was and transfer some horizontal lines, tick marks, and bolt-pattern marks onto a plywood template (which you will see in a moment):
Then set the new truss in place, check for horizontal using the template, and mark holes for the bulkhead bolts:
Drill those three holes (3/8" or 10mm). Bolt new truss into place, check horizontal again, align tickmarks, and mark mast base bolt-pattern onto new truss.
Then I drilled and tapped the new truss (5/16"--24tpi), which is not easy with 316L stainless.
New truss in place with template 'bolted' to it:
Mast plate will be within a millimeter or two of original location. I've also cut a new bilge divider/bulkhead/floor out of some phenolic countertop material, after first templating it in blue styroboard:
The flange on the truss will bolt to this divider (shimming as needed), and the inspection hole will help with airflow and monitoring of the space. I will drill weep holes for the truss cavity to drain into the main bilge.